* Versatile, water & sand control, clogging & screen damage prevention simultaneously
* Permanent deep profile control for fractured and vuggy reservoirs
* Good adaptability, water control feasible for enlarged and irregular wellbores
* Water control for water production & channeling due to heterogeneity & casing damage
* Independent water control unit formed by each ICD screen joint
* Needless to locate water, water control for existing & future water production points
* Easy operation, similar as gravel packing and takes 24-48h
* Upgrade in terms of technology, function and economics
© 2022 Anton Bailin Petroleum Technology (Beijing) Co., Ltd.