(1). Wellbore structure
①hanger packer for filling
②AB pack-off particles ring for the entire interval & annulus
③continuous ABICD string
(2). Functions of integrated completion for horizontal well water & sand control
© 2022 Anton Bailin Petroleum Technology (Beijing) Co., Ltd.